Before buying a Florida homesite →
Check buildability before falling in love with a floor plan.

Florida land-to-home library
Buying a lot or ready to build? Work through the decisions that shape your house plans, site work and permit package.
Find your local office, understand the documents to ask about and take the next step toward your Florida home.
This is a planning sequence, not a parcel-specific list of mandatory reports. Your permitting office and responsible design professionals confirm what applies.
Use the parcel ID and municipal boundary map to establish whether your property is within a city or in an unincorporated area. A mailing address or ZIP code alone is not the jurisdiction. Ask who handles building, zoning, floodplain and environmental review; these may be different offices.
Ask zoning about permitted use, setbacks, access, easements, lot coverage and any overlay restrictions. Check utility availability and whether septic or a well needs separate approval. Do this before committing to a plan or land-clearing scope.
Confirm the required boundary survey, topographic or spot-elevation information and tree inventory. These answer different questions: property limits, ground levels and trees cannot be substituted for one another. Ask which documents need a surveyor’s certification.
Start with FEMA mapping and the local floodplain office. Ask about flood zone, base flood elevation where established, required finished-floor elevation and drainage. Wetland map screening is a starting point; a site-specific determination may still be needed. Bringing in fill is not automatically an acceptable solution.
Ask the relevant offices and design professionals whether an arbor permit, tree survey, geotechnical investigation, wetland assessment or protected-species survey applies to your project. The answer depends on the site and proposed disturbance; not every report is required for every lot.
Have the responsible Florida design professionals confirm the applicable code edition, wind design criteria, structural system and foundation. Ask the permitting office which sheets must be signed and sealed and by whom. A concept or a plan stamped for another site is not automatically a permit-ready set for your address.
Coordinate the proposed building footprint, setbacks, driveway, utilities, septic or well if applicable, elevations, drainage and protected areas. Confirm which energy, mechanical, truss, product-approval and other discipline documents belong in your submission.
Use the correct department’s current application and submission portal. Track review comments and revised documents. Building, clearing, demolition and environmental approvals may follow separate paths. Do not treat a submitted application or a design rendering as permission to begin work.
Check buildability before falling in love with a floor plan.
Why an engineered plan must be coordinated for the actual site.
Understand which document answers which question before choosing a foundation.
Check floodplain and drainage constraints before raising or grading a lot.
Use early screening to identify when specialist field review may be needed.
Understand tree measurements and local preservation questions before clearing.
Coordinate approvals, utilities and site constraints before equipment arrives.
County guides include municipal links. Confirm the parcel boundary before choosing a permitting office.
FEMA Flood Map Service Center ↗
ASCE site hazard lookup guidance ↗
Florida DEP wetland evaluation and delineation ↗
Your next step
Tell PlanSet what you want to build and where. We can help scope house plans, site coordination and the supporting services your project may need. You approve the scope and price before paid work begins.
Helpful details: city or county, whether you already own the lot, your survey status and a plan or inspiration link. It’s okay if you don’t know yet.